首页> 外文期刊>Engineers Australia >Rail Breakdowns Due To Insufficient Maintenance
【24h】

Rail Breakdowns Due To Insufficient Maintenance

机译:维护不足导致的铁路故障

获取原文
获取原文并翻译 | 示例
       

摘要

A review of NSW government-owned train operator RailCorp by the Boston Consulting Group found that maintenance is "three times below" that of similar railways.rnTrain doors are ten times less reliable than those on Hong Kong's MTR trains, the review said. Braking systems are three times less reliable. Door and brake failures account for 40% of all "passenger delay minutes".rnAccording to the RailCorp Customer Service Improvement Program review, improving maintenance could decrease breakdowns by up to 50%.
机译:波士顿咨询集团(Boston Consulting Group)对新南威尔士州政府拥有的火车运营商RailCorp进行的审查发现,维护工作是同类铁路的“三倍”。rnn火车门的可靠性比香港地铁的可靠性低十倍。制动系统的可靠性低三倍。门和制动器故障占所有“乘客延迟分钟数”的40%。rn根据RailCorp客户服务改进计划的审查,改善维护可以最多减少50%的故障。

著录项

  • 来源
    《Engineers Australia》 |2008年第11期|22|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号