首页> 外文期刊>Engineers Australia >Milestone Achieved With Deck Over Railway
【24h】

Milestone Achieved With Deck Over Railway

机译:在铁路甲板上实现里程碑

获取原文
获取原文并翻译 | 示例
       

摘要

A critical engineering milestone was recently achieved on the new Media House building in Melbourne. The building's deck was completed over one of the city's busiest rail corridors. Preliminary work on building services and primary walls has now commenced, with facade work due to start this month.rnLocated opposite Southern Cross Station on Collins Street, 60% of the building's footprint sits over the rail lines.
机译:最近,墨尔本新的媒体楼大楼实现了关键的工程里程碑。该建筑的甲板已在该市最繁忙的铁路走廊之一上完成。建筑服务和主墙的初步工作现已开始,外墙工程将于本月开始。位于柯林斯街南十字车站对面的建筑物占地的60%位于铁路线上。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号