首页> 外文期刊>Engineers Australia >Duplicate bridge opens in Brisbane
【24h】

Duplicate bridge opens in Brisbane

机译:布里斯班双桥开通

获取原文
获取原文并翻译 | 示例
       

摘要

The second Gateway Bridge was officially opened last month, six months ahead of schedule. The event was open to the public, allowing pedestrians to walk across Brisbane's newest piece of road infrastructure.rnThe existing and the new bridge will now both be officially known as the Sir Leo Hielscher Bridges.rnLike its twin, the new bridge stands 64.5m at its highest point over the Brisbane River. It was constructed 50m downstream of the existing bridge and has the same shape, with the exception that it is 5m wider with the addition of a dedicated pedestrian and cycle way.rnThe new bridge used a twin box girder system to accommodate the extra width,rnrather than the single box design ot the old bridge.
机译:第二个网关桥于上个月正式开放,比原计划提前了六个月。该活动向公众开放,使行人可以穿越布里斯班最新的道路基础设施。rn现有的和新的桥梁现在都将被正式称为Sir Leo Hielscher Bridges。它的最高点在布里斯班河上。它在现有桥梁的下游50m处建造,并且形状相同,不同之处在于它的宽度增加了5m,并增加了专用的行人和自行车道。rn新桥使用双箱梁系统来容纳额外的宽度,而不是旧桥的单盒设计。

著录项

  • 来源
    《Engineers Australia》 |2010年第6期|P.12-14|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号