The completion of TransGrid's Beaconsfield substation redevelopment last November heralded the end of the world's first major insitu gas insulated substation (GIS) replacement. The end result is the largest 132kV GIS in the southern hemisphere. Due to a lack of available space on site, congestion of underground services and restrictions in the geography of the site, connections between the two new GIS buildings were completed using gas insulated line (GIL). This GIL was housed on an elevated gantry (9m in height) - a unique solution and an Australian-first. Due to a combination of ground conditions, contaminated soil issues, surface water and flooding issues, an above-ground cable management area was built with an ultra-efficient cable route design that allowed for segregation of circuits, control and protection duplication, and segregation of AC and DC cables. The substation was built on top of an Ausgrid cable tunnel, and the site interfaces to Ausgrid's cable bridge entering the site, so the cooperation and integration with Ausgrid infrastructure was implemented.
机译:去年11月,TransGrid的Beaconsfield变电站的重建工作完成,这预示着世界上第一个大型原位气体绝缘变电站(GIS)更换的结束。最终结果是南半球最大的132kV GIS。由于场地上的可用空间不足,地下服务的拥挤以及场地的地理限制,两座新的GIS建筑物之间的连接已使用气体绝缘线(GIL)完成。该GIL安装在高架龙门架上(高9m),这是独特的解决方案,是澳大利亚第一的解决方案。由于地面条件,污染土壤问题,地表水和洪水问题的综合影响,地上电缆管理区域采用了超高效的电缆布线设计,可实现电路隔离,控制和保护重复以及隔离。交流和直流电缆。变电站建在Ausgrid电缆隧道的顶部,站点与进入站点的Ausgrid电缆桥架接口,因此实现了与Ausgrid基础设施的合作和集成。

著录项

  • 来源
    《Engineers Australia》 |2013年第4appa期|46-46|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号