【24h】

IN BRIEF

机译:在信中

获取原文
获取原文并翻译 | 示例
       

摘要

A $2.2 billion mining infrastructure project in central Queensland has secured state government approval. Adani Mining's North Galilee Basin Rail (NGBR) Project - a 300km rail line linking the proposed $16.5 billion Carmichael Coal Project to the port of Abbot Point. It's estimated the rail line will take about two years to build and pump over $900 million into the state economy during its construction. The proposed greenfield rail line will be able to transport 100Mt/a of coal. It will include passing loops, road and rolling stock maintenance facilities, water supply pipeline, track and signalling maintenance facilities, and staff accommodation and training facilities.
机译:昆士兰州中部一个耗资22亿澳元的采矿基础设施项目已获得州政府的批准。阿达尼矿业公司的北加利利盆地铁路(NGBR)项目-一条300公里的铁路线,将拟议中的165亿美元的Carmichael Coal项目与Abbot Point港口连接起来。据估计,这条铁路线将花费大约两年的时间来建设,并在建设期间向州经济注入9亿美元。拟建的新建铁路线将能够输送100Mt / a的煤炭。它将包括通行环路,公路和机车车辆维修设施,供水管道,轨道和信号维修设施以及员工住宿和培训设施。

著录项

  • 来源
    《Engineers Australia》 |2014年第9期|26-26|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号