Analysis of Waste-Rock Transportation Process Performance in an Open-Pit Mine Based on Statistical Analysis of Cycle Times Data

机译:基于周期时间数据统计分析的露天矿Waste石运输过程绩效分析

获取原文
获取原文并翻译 | 示例
           

摘要

In this paper, the performance of a waste rock transportation process in an open pit mine was assessed by using cycle time data. A computerized truck-excavator dispatch system was used to record the cycle times. The process was broken into seven steps (or components of the total cycle), durations of which were recorded for a period of 1 month, leading to N= 60,690 data points or dispatches. The open pit mine studied consisted of 12 waste types loaded by 14 excavators and hauled by 49 trucks (at a trucks-to-excavator ratio of 3.5:1) in 75 changing locations. The string-type data was coded using integers to allow a FORTRAN code to extract process performance parameters using statistical analysis. The study established a wide range of parameters including: the waste material generation rate (about 1.73 million t/month, 81% comprising waste rock), truck fill factor, f, total cycle time (T_(ct)), production capacity, theoretical cycle time, non-productive cycle time T_(np), and cycle time performance ratio (CTPR), denoted as T_(pr) The factors affecting the process performance include: truck model, excavator model, location (haul distance and road conditions) and material type. For a fixed material type and tonnage, the PDFs of the cycle time components were logarithmic in nature, capable of differentiating performance variations under different factors. It was concluded that the performance of the waste material transportation system in this mine was determined to be acceptable due to mean value of T_(pr) = 2.432 being closer to unity. Reduction measures were suggested to minimize the cycle time for the process bottlenecks determined from Pareto analysis (that is, full haul, empty haul and loading processes).
机译:在本文中,使用循环时间数据评估了露天矿中废石运输过程的性能。使用计算机化的卡车挖掘机调度系统来记录周期时间。该过程分为七个步骤(或总周期的组成部分),其持续时间记录了1个月,导致N = 60,690个数据点或调度。所研究的露天矿包括在14个挖掘机中装载的12种废物类型,并由49辆卡车(卡车与挖掘机之比为3.5:1)在75个变化的地点拖运。使用整数对字符串类型的数据进行编码,以允许FORTRAN代码使用统计分析来提取过程性能参数。该研究建立了广泛的参数,包括:废料产生率(约173万吨/月,占废石的81%),卡车填充系数,f,总循环时间(T_(ct)),生产能力,理论值循环时间,非生产循环时间T_(np)和循环时间性能比(CTPR),表示为T_(pr)。影响过程性能的因素包括:卡车模型,挖掘机模型,位置(运输距离和路况)和材料类型。对于固定的材料类型和吨位,周期时间分量的PDF本质上是对数的,能够区分不同因素下的性能差异。结论是,由于T_(pr)= 2.432的平均值更接近于1,因此该矿山中的废物运输系统的性能被确定为可以接受。建议采取减少措施,以最大程度减少通过帕累托分析确定的过程瓶颈(即,全程,空程和装载过程)的周期时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号