首页> 外文期刊>Engineering news-record >TORONTO'S $2.6-BILLION EXPANSION IS A YEAR FROM PEAK, AND HUFFING
【24h】

TORONTO'S $2.6-BILLION EXPANSION IS A YEAR FROM PEAK, AND HUFFING

机译:多伦多26亿美元的扩张是一年,从高峰到低谷

获取原文
获取原文并翻译 | 示例
       

摘要

The $2.6-billion redevelopment of Toronto's Lester B. Pearson International Airport is rapidly consuming local labor, material and construction capability, and it is still more than a year from peak and six years from completion.rnThe project's centerpiece is a new horseshoe-shaped terminal that accounts for half of its cost. It will replace two outdated structures and be able to handle 50 million passengers a year. The terminal's first stage, set to open in 2003, will include rnthe main building, two passenger boarding piers and a connecting "liner." Two more piers will be built by 2007. The entire 130-gate terminal will cover an area equal to 50 football fields.
机译:多伦多耗资26亿加元的皮尔逊国际机场(Lester B.Pearson International Airport)的重建项目正在迅速消耗当地的劳动力,材料和建筑能力,距高峰期尚需一年多的时间,竣工尚需六年时间。占成本的一半。它将取代两个过时的结构,每年将可容纳5000万乘客。该航站楼的第一阶段将于2003年开放,将包括主楼,两个登机码头和一个相连的“班轮”。到2007年将再建造两个码头。整个130个门的码头将覆盖相当于50个足球场的区域。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号