首页> 外文期刊>Engineering news-record >I-93 Panel Leaks Plague Boston's Central Artery Job
【24h】

I-93 Panel Leaks Plague Boston's Central Artery Job

机译:I-93小组泄漏导致波士顿中央动脉疫灾

获取原文
获取原文并翻译 | 示例
       

摘要

A leaking slurry wall panel on Boston's $14.6-billion Central Artery/Tunnel project may need major repairs, presage other problems and spark cost recovery action against contractors and consultants. Mueser Rutledge Consulting Engineers, New York City, has reviewed installation records for defective panel EO-45 and now is looking at other panels. The Interstate 93 tunnel box is structurally sound, but EO-45 repairs could cost $250,000 and take months. "This is unacceptable and the taxpayers and toll-payers will not pay for it," says Matthew J. Amorello, chairman of the Massachus-setts Turnpike Authority, the CA/T project overseer.
机译:波士顿耗资146亿美元的中央动脉/隧道项目的漏浆墙面板可能需要大修,预示其他问题,并要求承包商和顾问收回成本。纽约市Mueser Rutledge咨询工程师已经检查了有缺陷的EO-45面板的安装记录,现在正在寻找其他面板。 93号州际公路的隧道箱在结构上是稳固的,但EO-45的修理可能要花费25万美元,而且要花费数月的时间。 CA / T项目监督者马萨诸塞定居公路收费局主席马修·J·阿莫雷洛说:“这是不可接受的,纳税人和通行费支付者不会为此付费。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号