首页> 外文期刊>Engineering news-record >County and Pipeline Contractor Fight Over Environmental Risks
【24h】

County and Pipeline Contractor Fight Over Environmental Risks

机译:县和管道承包商应对环境风险

获取原文
获取原文并翻译 | 示例
       

摘要

The bid came in low, the due diligence was performed and MasTec Inc., the big Miami-based specialty contractor, went to work building a 60-mile-long natural gas pipeline between Coos Bay and Roseberg in Oregon. But the project so far has produced more lawsuits than energy because MasTec and Coos County each believe the other is responsible for the unexpectedly costly environmental problems. The level of environmental scrutiny has been high even for environmentally conscious Oregon partly because building trade unions have targeted nonunion MasTec as part of a pressure campaign, say sources involved in the project.
机译:竞标价格很低,已经进行了尽职调查,总部位于迈阿密的大型专业承包商MasTec Inc.开始着手建设一条位于库斯湾和俄勒冈州罗斯伯格之间的60英里长的天然气管道。但是到目前为止,该项目所产生的诉讼胜过能源方面的诉讼,因为MasTec和Coos County各自认为对方是造成意料之外的代价昂贵的环境问题的原因。参与该项目的消息人士称,即使是对具有环保意识的俄勒冈州,对环境的审查程度也很高,部分原因是,建筑工会已将不工会MasTec作为针对压力运动的一部分。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号