首页> 外文期刊>Engineering news-record >Surgical Demolition Cuts Million Sq Ft Plant In Half
【24h】

Surgical Demolition Cuts Million Sq Ft Plant In Half

机译:手术拆除将百万平方英尺的工厂减半

获取原文
获取原文并翻译 | 示例
       

摘要

MCM Management Corp, under contract to Daimler Chrysler, mobilized in July 2004 to DCX's former New Castle Forge facility in New Castle, IN. This historic plant, a community fixture for 100 years, employed many residents for multiple generations. The performance of industrial demolition in congested commercial/residential settings in a safe, clean, and respectable manner is a hallmark of MCM operations. Work-scope items included asbestos abatement, environmental cleaning, structural and interior demolition, and construction of a 1,200-linear-ft wall to serve as the new exterior wall for the remaining operating facility.
机译:根据与戴姆勒·克莱斯勒(Daimler Chrysler)签订的合同,MCM管理公司于2004年7月动员到DCX在印第安纳州新城堡的前新城堡福奇工厂。这家历史悠久的工厂是一个拥有100年历史的社区设施,雇用了许多代的居民。 MCM操作的标志是在拥挤的商业/住宅环境中以安全,清洁和受人尊敬的方式进行工业拆除。工作范围的项目包括消除石棉,环境清洁,结构和内部拆除,以及建造1200英尺英尺的墙,以作为其余运营设施的新外墙。

著录项

  • 来源
    《Engineering news-record》 |2005年第21期|p.D8|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

  • 入库时间 2022-08-18 00:16:53

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号