首页> 外文期刊>Engineering news-record >Engineering Audits Required For California Oil Facilities
【24h】

Engineering Audits Required For California Oil Facilities

机译:加州石油设施所需的工程审核

获取原文
获取原文并翻译 | 示例
       

摘要

California marine oil terminals are preparing to audit their facilities in compliance with a February upgrade to the state's building code. The process, which must be completed within two years, is expected to cost some $300 million to improve seismic resistance and modernize the terminals. A recent incident at Chevron Long Wharf in Richmond highlighted the need for upgrading when forces induced by a passing vessel pulled a moored vessel off the wharf. Both vessels were about the same size, at 45,000 dead weight tonnage. The wharf was built in the 1940s to accommodate vessels of 5,000 to 10,000 DWT. The average age of California's marine oil terminals is over 50 years.
机译:加利福尼亚海洋石油码头准备根据2月份对该州建筑法规的升级,对其设施进行审核。该过程必须在两年内完成,预计将花费约3亿美元来改善抗震性和现代化码头。最近在里士满的雪佛龙长码头发生的事件突出表明,当过往船只引致的力量将停泊的船只从码头上拉下时,有必要进行升级。两艘船的大小大致相同,载重吨位为45,000。该码头建于1940年代,可容纳5,000至10,000 DWT的船舶。加州海洋石油码头的平均年龄超过50年。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号