首页> 外文期刊>Engineering news-record >Abu Dhabi's 'Illogical' Crossing Slowly Takes Shape
【24h】

Abu Dhabi's 'Illogical' Crossing Slowly Takes Shape

机译:阿布扎比的“不合逻辑”穿越慢慢成形

获取原文
获取原文并翻译 | 示例
       

摘要

The flowing profiles of Abu Dhabi island's iconic third bridge to the mainland are slowly emerging as engineers struggle with the "almost unbuildable" structure. Like illuminated ribbons, twin decks of the 845-meter-long Sheikh Zayed crossing will sweep through waves of supporting structural boxes and curve in two planes to create one of the world's most radical highway bridges. Though dramatic, the bridge is "structurally illogical," says Mike King, project manager with structural designer/supervisor High-Point Rendel, London. Design took four times longer than the allocated nine months.
机译:随着工程师们为“几乎无法建造”的建筑而苦苦挣扎,阿布扎比岛标志性的通往大陆的第三座桥梁的流动轮廓正在慢慢显现。就像照明的彩带一样,长达845米的谢赫·扎耶德(Sheikh Zayed)交叉口的双甲板将席卷支撑结构箱的波浪,并在两个平面上弯曲,从而打造出世界上最激进的公路桥梁之一。伦敦High-Point Rendel结构设计师/主管的项目经理Mike King说,尽管这座桥很引人注目,但“在结构上是不合逻辑的”。设计花费的时间比分配的九个月时间长了四倍。

著录项

  • 来源
    《Engineering news-record》 |2007年第16期|p.16-17|共2页
  • 作者

    Peter Reina;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

  • 入库时间 2022-08-18 00:16:18

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号