首页> 外文期刊>Engineering news-record >Seepage Stopped By Prompt action, Overwhelming Force
【24h】

Seepage Stopped By Prompt action, Overwhelming Force

机译:渗流被迅速的行动阻止,压倒性的力量

获取原文
获取原文并翻译 | 示例
           

摘要

A near failure of Arthur V Watkins Dam, a leaking U-shaped earth-fill levee structure located 10 miles northwest of Ogden, Utah, is prompting a compressed-schedule repair, squeezing two years of work into one. The dam was within a few days of failure, U.S. Bureau of Reclamation officials say, threatening lives and major flood damage to surrounding property. General contractor Geo-Solutions Inc., New Kensington, Pa., is consequently running double shifts and using specially modified equipment to speed up repair work. It designed a 150-cu-yd-per-hour slurry plant fed by twin 60-ton silos for three times the output of a typical facility. Geo-Solutions additionally customized a Komatsu PC 1250 hydraulic excavator with a hybrid boom stick that can extend 85 ft for tough excavations.
机译:位于犹他州奥格登西北10英里处的U形漏水U形堤坝结构Arthur V Watkins大坝险些险些倒塌,正在推动压缩时间表的修复,将两年的工作压缩为一个。美国开垦局官员说,大坝在倒塌后的几天内就威胁了生命并严重破坏了周围的财产。因此,宾夕法尼亚州新肯辛顿的总承包商Geo-Solutions Inc.正在实行双班制,并使用经过特殊改装的设备来加快维修工作。它设计了一个每小时150立方码的泥浆厂,由两个60吨的筒仓供料,其产量是典型设施的三倍。 Geo-Solutions还另外定制了带有混合动臂杆的小松PC 1250液压挖掘机,该动臂杆可以延伸85英尺,用于艰苦的挖掘。

著录项

  • 来源
    《Engineering news-record》 |2008年第16期|p.68-69|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号