首页> 外文期刊>Engineering news-record >Battered National Guard Facilities Are Design-Build Lab
【24h】

Battered National Guard Facilities Are Design-Build Lab

机译:受虐的国民警卫队设施是设计建造实验室

获取原文
获取原文并翻译 | 示例
       

摘要

The largest public-works program in the history of the National Guard is racing to a finish, with 14 of 16 hurricane-recovery design-build contracts under budget and the last one scheduled for delivery by late next summer. In fall 2005, Hurricanes Katrina and Rita damaged or destroyed all 189 Louisiana Army National Guard facilities. By December 2005, Congress had appropriated funds to rebuild, but with a short fuse: "We had to award contracts within nine months," says Lt. Col. William Aldridge, construction facilities management officer for LANG. The $467 million was equal in cost to all other Guard construction programs executed in 50 states and four territories in fiscal year 2006, combined.
机译:国民警卫队历史上最大的公共工程计划正在迅速完成,在预算范围内,有16项飓风恢复设计建造合同中有14项处于预算之内,最后一项计划于明年夏末交付。 2005年秋天,卡特里娜飓风和丽塔飓风损坏或摧毁了路易斯安那州国民军189个国民警卫队的所有设施。 LANG的建筑设施管理官William Aldridge中校说,到2005年12月,国会已拨出资金进行重建,但有一个短暂的融合:“我们必须在9个月内授予合同。” 2006年财政年度,4.67亿美元的成本与在50个州和四个地区执行的所有其他Guard建造计划的费用相等。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号