...
【24h】

Ciardullo

机译:恰尔杜洛

获取原文
获取原文并翻译 | 示例

摘要

Roots What's interesting, having gone to engineering school and worked as an engineer, is the point of view I gained as an architect about design-build. Usually, design-build puts architects and professionals in what appears to be initially a bad position. The contractor has the contract. They say, "I didn't anticipate this," and push it back at you. It becomes a pushing thing. Architects have to learn to be pushed, and how to push back - gently if they want to do design-build.
机译:根源有趣的是,我去了工程学院并担任过工程师,这是我作为一名建筑师设计与构建的观点。通常,设计建造会将建筑师和专业人员放在最初看起来很糟糕的位置。承包商有合同。他们说:“我没想到这一点,”然后把它推向你。它成为推动的事情。建筑师必须学会被推挤,以及如何向后推-如果他们想进行设计建造,则必须轻轻地推。

著录项

  • 来源
    《Engineering news-record 》 |2009年第14期| 23| 共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号