首页> 外文期刊>Engineering news-record >ConnDOT Seeks Qualified Bidders New Haven Rail Yard Facilities Improvement Program
【24h】

ConnDOT Seeks Qualified Bidders New Haven Rail Yard Facilities Improvement Program

机译:ConnDOT寻求合格的投标人纽黑文铁路围场设施改进计划

获取原文
获取原文并翻译 | 示例
       

摘要

The Connecticut Department of Transportation (ConnDOT) will advertise the Component Change Out Shop construction project (State Project No. 301 -0106) in late May or early June 2009, as part of the New Haven Rail Yard Facilities Improvement Program.rnThis is the first of several maintenance facilities planned for the New Haven Rail Yard to maintain the new fleet of multiple-unit electric rail cars in a coordinated campus. The new shop will be approximately 300,000 square feet with one targe ground floor with 13 car spots on three tracks, a mezzanine and three partial floors containing workshops, employee welfare facilities, and administrative offices. The shop contains large cranes, lifts and hoists to service the cars, a DC power system, and back shops to rebuild and test components. Sitework improvements consist of drainage, utilities, paving, fencing, site lighting, overhead catenary and associated work. The shop will be located on the edge of the current yard allowing independent access from off site.
机译:康涅狄格州交通运输部(ConnDOT)将于2009年5月下旬或6月初发布“零件更换车间”建设项目(国家项目301 -0106)的广告,这是纽黑文铁路场设施改善计划的一部分。为纽黑文铁路场计划的几项维护设施中的一部分,将在一个协调的校园中维护新的多单元电动轨道车车队。新商店将占地约300,000平方英尺,其中一个目标地面,在三个轨道上有13个停车位,一个夹层,三个局部楼层,其中包括车间,员工福利设施和行政办公室。该车间包括用于维修汽车的大型起重机,升降机和吊车,直流电源系统,以及用于重建和测试组件的后车间。现场工作的改进包括排水,公用设施,铺路,围墙,现场照明,架空接触网及相关工作。商店将位于当前院子的边缘,允许从场外独立进入。

著录项

  • 来源
    《Engineering news-record》 |2009年第10期|71-71|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:15:01

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号