首页> 外文期刊>Engineering news-record >Delayed Action Could Bring Everything Down
【24h】

Delayed Action Could Bring Everything Down

机译:延误的行动可能会使一切崩溃

获取原文
获取原文并翻译 | 示例
       

摘要

President Obama faces enormous challenges during his administration, and establishing a new vision for America's infrastructure must be one of them. The current stimulus package allocates just over $64 billion to transportation infrastructure projects. Although this welcome funding can jump-start thousands of sidelined projects, create jobs and begin to address a massive maintenance backlog, the sobering truth is this major cash infusion will not reverse the serious issues that transportation infrastructure faces. We need a new plan. Waiting is not an option. The consequences of spot projects and delayed action are far greater than being stuck in traffic or late for supper. If our transportation system is allowed to fall into greater disrepair, it could bring everything down with it-our economy, our environment, our national security, our safety and our quality of life. That is why this isn't just another crisis.
机译:奥巴马总统在执政期间面临巨大挑战,为美国基础设施树立新愿景必须是其中之一。当前的一揽子刺激计划为交通基础设施项目分配了刚刚超过640亿美元的资金。尽管这笔可喜的资金可以启动成千上万个项目,创造工作并开始解决大量的维护积压,但清醒的事实是,大量的现金注入不会扭转交通基础设施面临的严重问题。我们需要一个新计划。等待不是一种选择。现场项目和行动延迟的后果远不止于交通拥堵或晚饭。如果我们的运输系统严重失修,它可能会破坏我们的经济,我们的环境,我们的国家安全,我们的安全和我们的生活质量。这就是为什么这不仅仅是另一场危机。

著录项

  • 来源
    《Engineering news-record》 |2009年第9期|p.78|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

  • 入库时间 2022-08-18 00:15:00

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号