首页> 外文期刊>Engineering news-record >How To Use Enr's Cost Indexes
【24h】

How To Use Enr's Cost Indexes

机译:如何使用Enr的成本指数

获取原文
获取原文并翻译 | 示例
       

摘要

Readers of ENR generate a steady stream of questions about the magazine's indexes and how to accurately apply them to construction projects. To help clarify the nature and uses of the cost indexes, here are answers to the most frequently asked questions and suggestions on how to avoid costly mistakes. The difference is in their labor component. The CCI uses 200 hours of common labor, multiplied by the 20-city average rate for wages and fringe benefits. The BCI uses 68.38 hours of skilled labor, multiplied by the 20-city wage-fringe average for three trades-bricklayers, carpenters and structural ironworkers. For their materials component, both indexes use 25 cwt of fabricated standard structural steel at the 20-city average price, 1.128 tons of bulk portland cement priced locally and 1,088 board-ft of 2x4 lumber priced locally. The ENR indexes measure how much it costs to purchase this hypothetical package of goods compared to what it was in the base year.
机译:ENR的读者不断提出有关杂志索引以及如何将其准确应用于建筑项目的问题。为了帮助弄清成本指标的性质和用途,以下是一些最常见问题的解答以及如何避免代价高昂的错误的建议。不同之处在于它们的劳动成分。 CCI使用200个小时的普通劳动,再乘以20个城市的工资和附加福利平均费率。 BCI使用68.38个小时的熟练工人,再乘以20个城市的工资水平,用于三个行业的砖瓦匠,木匠和结构铁工。对于它们的材料成分,这两个指数均使用25 cwt的预制标准结构钢,均价为20个城市,本地价格为1.128吨散装硅酸盐水泥,本地价格为1,088板英尺的2x4木材。 ENR指标衡量的是与基准年相比购买此假想商品包装的成本。

著录项

  • 来源
    《Engineering news-record》 |2009年第9期|p.37-38|共2页
  • 作者

    Tim Grogan;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

  • 入库时间 2022-08-18 00:14:58

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号