首页> 外文期刊>Engineering news-record >Airports Reroute Construction Priorities
【24h】

Airports Reroute Construction Priorities

机译:机场改道建设重点

获取原文
获取原文并翻译 | 示例
       

摘要

The economic and political uncertainty endemic in other sectors of the construction economy has now reached the airport design and construction market, which has enjoyed a relatively robust decade due in part to the momentum of extended project planning and implementation schedules. "We're at the tail end of the pre-reces-sion construction/project implementation cycle," explains Christopher Oswald, vice president of safety and technical operations for the Airports Council International-North America. "Programs that began in the late 1990s and early 2000s are now coming to fruition."
机译:建筑经济其他领域普遍存在的经济和政治不确定性现已进入机场设计和建筑市场,该市场经历了一个相对强劲的十年,部分原因是项目计划和实施进度计划的扩展。国际机场理事会国际北美安全和技术运营副总裁克里斯托弗·奥斯瓦尔德(Christopher Oswald)解释说:“我们处于衰退前建设/项目实施周期的最后阶段。” “始于1990年代末和2000年代初的计划现已实现。”

著录项

  • 来源
    《Engineering news-record》 |2011年第13期|p.56-57|共2页
  • 作者

    Jim Parsons;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:14:33

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号