首页> 外文期刊>Airport magazine >AIRPORT CONSTRUCTION IN UNPRECEDENTED TIMES: DENVER INTERNATIONAL AIRPORT CONSTRUCTION CONTINUES AMID COVID-19
【24h】

AIRPORT CONSTRUCTION IN UNPRECEDENTED TIMES: DENVER INTERNATIONAL AIRPORT CONSTRUCTION CONTINUES AMID COVID-19

机译:前所未有的时代机场建设:丹佛国际机场建设在Covid-19中继续

获取原文
获取原文并翻译 | 示例
       

摘要

The COVID-19 pandemic disrupted the entire aviation industry, including major impacts to construction at airports. While passenger traffic was plummeting in March and April 2020, airports were forced to consider what to do with construction that was already underway or planned for the future. At Denver International (DEN), as passenger traffic dropped to an all-time low, the leadership team evaluated the airport's ongoing Capital Improvement Program (CIP), a $3.5 billion program launched in 2018 to address current and future growth and make necessary updates to DEN's 25-year old facility. Ultimately, it was determined that DEN must continue to move forward with its CIP in order to prepare for future growth that likely will resume once the pandemic ends.
机译:Covid-19大流行中断了整个航空业,包括在机场建设的主要影响。虽然旅客交通在3月和4月2020年4月下降,但机场被迫考虑与已经进行或未来计划的建筑有关。在丹佛国际(DEN),作为乘客的流量下降到历史胜利,领导团队评估了机场正在进行的资本改善计划(CIP),2018年推出的35亿美元计划,以解决当前和未来的增长并进行必要的更新书房25岁的设施。最终,确定登盟必须继续向前迈进,以便为未来的增长做好准备,这可能会恢复大流行结束。

著录项

  • 来源
    《Airport magazine》 |2021年第2期|30-33|共4页
  • 作者

    MICHAEL SHEEHAN; STU WILLIAMS;

  • 作者单位

    Denver International;

    airport expansion Denver International;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng