首页> 外文期刊>Engineering news-record >Alaska Lawmakers Approve Dam and 600-MW Powerplant
【24h】

Alaska Lawmakers Approve Dam and 600-MW Powerplant

机译:阿拉斯加立法者批准大坝和600兆瓦发电厂

获取原文
获取原文并翻译 | 示例
       

摘要

After 50-plusyears in the making, the Alaska state Legislature recently gave the Alaska Energy Authority approval to build and own a new dam on the Sustina River in the Watana area. The 600-MW hydroelectric dam will be the first of its kind built in the United States in more than two decades. Preliminary work on the $4.5-billion Sustina Hydroelectric Power Project, located in Alaska's rail-belt region about 90 miles south of Fairbanks, puts the project on track for completion in seven years and to provide new energy online by 2025. This plan dovetails with the energy goal of Alaska Gov. Sean Parnell (R): to generate half the state's power from renewable and alternative sources by the same year.
机译:经过50多年的建设,阿拉斯加州立法机关最近批准了阿拉斯加能源局在Watana地区的Sustina河上建造和拥有新大坝。 600兆瓦的水力发电大坝将是二十多年来在美国建造的第一座此类水坝。位于阿拉斯加费尔班克斯以南约90英里的阿拉斯加铁路带地区的这项耗资45亿美元的Sustina水电项目的初步工作使该项目有望在7年内完成,并在2025年之前提供在线新能源。阿拉斯加州州长肖恩·帕内尔(Sean Parnell)的能源目标:到同年,将州的一半能源来自可再生能源和替代能源。

著录项

  • 来源
    《Engineering news-record》 |2011年第15期|p.15|共1页
  • 作者

    Tim Newcomb;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:14:23

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号