首页> 外文期刊>Engineering news-record >Mobile High-Resolution Megapixel Cameras Keep Accelerated 1-93 Fast 14 Bridge Project in View
【24h】

Mobile High-Resolution Megapixel Cameras Keep Accelerated 1-93 Fast 14 Bridge Project in View

机译:移动高分辨率百万像素相机在视野中加速1-93 Fast 14 Bridge项目

获取原文
获取原文并翻译 | 示例
       

摘要

The I-93 Fast 14 bridge project is one of the industry's most impressive examples of accelerated bridge construction. Over 10 weekends between June and mid-August 2011, the J.F. White-Kiewit joint venture team of J.F. White Contracting Co. and Kiewit Construction Corp. replaced 14 deteriorated bridge superstructures along I-93 in Medford, Mass. Each bridge was on a 55-hour concentrated schedule with severe penalties if the highway was not fully open to traffic with a new bridge prior to 5 a.m.
机译:I-93 Fast 14桥梁项目是业内最令人印象深刻的加速桥梁建设实例之一。在2011年6月至2011年8月中旬的10个周末中,JF White Contracting Co.和Kiewit Construction Corp.的JF White-Kiewit合资团队更换了马萨诸塞州梅德福I-93沿线的14座损坏的桥梁上部结构。如果高速公路在凌晨5点之前没有通过新桥完全通车,则实行小时集中的时间表,并处以严厉的处罚

著录项

  • 来源
    《Engineering news-record》 |2012年第15期|p.B14|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:13:59

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号