首页> 外文期刊>Engineering news-record >Managing Alternative Project Delivery Expectations
【24h】

Managing Alternative Project Delivery Expectations

机译:管理替代项目交付期望

获取原文
获取原文并翻译 | 示例
       

摘要

Alternative project delivery mechanisms, such as integrated project delivery (IPD) or public-private partnerships (PPP), pose a challenge to the insurance industry in that they have contractual liabilities that are distinctive from the traditional tort liability system of law in the U.S. The nature of an IPD contract, for instance, assumes that all program participants share the liabilities and responsibilities of the project, as compared to where one contractor is liable for their part, or perhaps a defective condition.
机译:替代项目交付机制,例如综合项目交付(IPD)或公私伙伴关系(PPP),对保险业构成了挑战,因为它们具有不同于美国传统侵权责任法律体系的合同责任。例如,IPD合同的性质假定所有计划参与者均承担项目的责任和义务,而承包商只应对此承担责任或存在缺陷。

著录项

  • 来源
    《Engineering news-record》 |2012年第6期|p.54|共1页
  • 作者

    Scott Rasor;

  • 作者单位

    Head of Construction Zurich North America Commercial;

  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:13:58

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号