Drilled Shafts Set Foundation of New St. Croix River Crossing Bridge

机译:新圣克罗伊河过桥的钻轴设置基础

获取原文
获取原文并翻译 | 示例
       

摘要

The new St. Croix River Crossing Bridge over the St. Croix River in Stillwater, Minn., will be the second extradosed bridge constructed in the U.S. when it's complete in 2016. A vital part of the construction is the bridge foundations, which includes 41 9-ft-dia drilled shafts with depths ranging from 61 ft to 161 ft. The drilled shafts are then filled with rebar and concrete to create solid foundations for the new bridge. All work was performed off barges on the St. Croix River using specialized drill rigs developed just for the project. The challenges of deep foundation work while working off of barges required total commitment from the project team. The dedication of the field management and crew not only to their craft, but more importantly safety helped to achieve to the project's success. Thanks to the partnership between Case, Edward Kraemer Sons, Inc. and the Minnesota Dept. of Transportation, Case Foundation Co. wrapped up drilled shaft work in October 2013-on schedule.
机译:明尼苏达州斯蒂尔沃特市新的圣克鲁瓦河过桥将于2016年完工,这将是美国第二座加建的桥梁。桥梁基础是建筑的重要组成部分,其中包括41个直径9英尺的竖井,深度从61英尺到161英尺。然后,将竖井填充钢筋和混凝土,为新桥奠定坚实的基础。所有工作都是使用专为该项目开发的专用钻机在圣克鲁瓦河上的驳船上进行的。在克服驳船的同时进行深层基础工作的挑战需要项目团队的全力以赴。现场管理人员和工作人员不仅奉献自己的技术,更重要的是,安全性帮助实现了项目的成功。由于Case,Edward Kraemer Sons,Inc.和明尼苏达州交通运输部之间的合作,Case Foundation Co.按计划在2013年10月完成了钻探井筒工程。

著录项

  • 来源
    《Engineering news-record》 |2013年第14期|42-42|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:12:46

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号