首页> 外文期刊>Engineering news-record >Consider Heavy Lift and Transportation Needs Early for Cost-Effective Solutions and Optimized Projects
【24h】

Consider Heavy Lift and Transportation Needs Early for Cost-Effective Solutions and Optimized Projects

机译:尽早考虑重型起重和运输需求,以实现经济高效的解决方案和优化的项目

获取原文
获取原文并翻译 | 示例
           

摘要

While front-end engineering design is a part of most projects, especially those of large scale, an important aspect that is sometimes overlooked is that of heavy lift and transportation needs. The team at Burkhalter too often sees clients wait to consider these factors until late in the project, after much work has already been done. Common mistakes seen are the lack of consideration for what heavy lifting equipment is required, the space necessary for the equipment onsite, as well as fabricating equipment in one location without determining how it will get to its final destination.
机译:尽管前端工程设计是大多数项目(尤其是大型项目)的一部分,但有时却忽略了重要的方面,即重型起重和运输需求。在完成许多工作之后,Burkhalter的团队经常看到客户在项目后期才考虑这些因素。常见的错误是没有考虑需要什么重型起重设备,设备现场所需的空间以及在一个位置制造设备而未确定如何到达最终目的地的问题。

著录项

  • 来源
    《Engineering news-record》 |2013年第17期|69-69|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号