首页> 外文期刊>Engineering news-record >Complex Project. Firm Deadline. Mission Accomplished
【24h】

Complex Project. Firm Deadline. Mission Accomplished

机译:复杂项目。截止日期。任务完成

获取原文
获取原文并翻译 | 示例
           

摘要

With five new facilities, a major renovation of an existing facility and a host of new infrastructure to be completed in just 28 months, the Aberdeen Proving Ground C4ISR BRAC program in Maryland had great potential for serious and costly delays. Yet the complex project was delivered on time and $93 million under budget. The reasons for this success include a combination of organizational collaboration and technical innovation. The Army Corps of Engineers, three private sector companies (MOCA Systems, MSS and ARGO), plus an array of architects and contractors, created a strong collaborative culture.
机译:马里兰州的阿伯丁试验场C4ISR BRAC计划拥有5座新设施,对现有设施的重大翻新工程和许多新基础设施,这些工程将在短短28个月内完成。然而,这个复杂的项目却按时交付,并且比预算少了9300万美元。成功的原因包括组织协作和技术创新的结合。陆军工程兵团,三个私营部门公司(MOCA Systems,MSS和ARGO)以及一系列建筑师和承包商共同营造了强大的协作文化。

著录项

  • 来源
    《Engineering news-record》 |2013年第17期|2426|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号