摘要

To facilitate construction of new buildings and associated piping for the Woodland Reservoir Ultraviolet Light Treatment Facility in Syracuse, N.Y., Schnabel Foundation Co. designed and constructed an earth retention system utilizing overlapping steel reinforced concrete secant piles and tiebacks. Schnabel installed 600-plan-ft of secant pile wall with drilled depths of up to 63 ft within the existing reservoir embankment, which has been in service since 1894. Tiebacks were installed and tested to laterally support the secant pile wall for excavation depths of up to 41 ft. Close coordination between Schnabel and the project general contractor, C.O. Falter Construction Corp., was essential to maintaining the project schedule during secant pile and tieback installation.
机译:为了促进纽约州锡拉库扎市伍德兰水库紫外线灯处理设施的新建筑物和相关管道的建设,施纳贝尔基金会设计和建造了一个土方挡土墙系统,该系统使用了重叠的钢筋混凝土割线桩和回扣。施纳贝尔在1894年起投入服务的现有水库堤防中,安装了600平面英尺的割线桩墙,钻孔深度最大为63英尺。安装并测试了枕木,以横向支撑割线桩墙的开挖深度。到41英尺。Schnabel与项目总承包商CO进行密切协调Falter Construction Corp.,对于在割线打桩和回拉安装过程中维护项目进度至关重要。

著录项

  • 来源
    《Engineering news-record》 |2013年第14期|S8-S8|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:12:36

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号