首页> 外文期刊>Engineering news-record >Motor City Costs Cruise at National Speed Limit
【24h】

Motor City Costs Cruise at National Speed Limit

机译:汽车城以国家限速为代价巡航

获取原文
获取原文并翻译 | 示例
       

摘要

Construction costs in Detroit begin the year 3.0% above 2012's level. That is just 0.1 % higher than the national average, according to ENR's 20-city average Construction Cost Index. The city's building cost index starts 2013 with a 2.4% annual escalation rate, compared to 2.1% for the national BCI, according to ENR. The Detroit cost indexes received a relative boost from material costs, which posted a 3.0% increase in the city's index, compared to just a 1.7% hike nationwide. Labor costs in Detroit were up between 2.2% and 3.0%.
机译:底特律的建筑成本年初比2012年高出3.0%。根据ENR的20个城市的平均建筑成本指数,这仅比全国平均水平高出0.1%。根据ENR的数据,2013年开始,纽约市的建筑成本指数的年增长率为2.4%,而全国BCI指数为2.1%。底特律成本指数受到材料成本的相对提振,材料成本指数上涨了3.0%,而全国范围内的涨幅仅为1.7%。底特律的人工成本上涨了2.2%至3.0%。

著录项

  • 来源
    《Engineering news-record》 |2013年第1期|25-25|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:12:33

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号