首页> 外文期刊>Engineering news-record >Accelerating New Daniel Boone Bridge Construction Over the Missouri River
【24h】

Accelerating New Daniel Boone Bridge Construction Over the Missouri River

机译:加快密苏里河上新的丹尼尔·布恩大桥的建设

获取原文
获取原文并翻译 | 示例
       

摘要

In St. Louis, Mo., construction is under way on the new Daniel Boone Bridge that will carry four lanes of eastbound traffic over the Missouri River and will have a 64-ft clear roadway and a barrier-protected 10-ft-wide bike-pedestrian path connecting the Katy Trail and the Monarch Levee Trail. The $m-million design-build project includes the design and construction of the new 2,615-ft bridge, repairs to an existing eastbound structure and demolition of an existing westbound structure. An important goal of the Missouri Dept. of Transportation was to minimize construction impacts to traffic along the I-64 corridor. The new bridge is being constructed without reducing the number of lanes throughout the process. In three months, Burns & McDonnell completed a state-of-the-art design for the bridge that is on an accelerated schedule for completion by July 1, 2015.
机译:在密苏里州圣路易斯,新的丹尼尔·布恩大桥正在施工中,该大桥将在密苏里河上通行四车道,向东行进,将有一条64英尺高的畅通道路和一个10英尺宽的障碍物防护自行车凯蒂步道(Katy Trail)和君主大道(Monarch Levee Trail)的人行道。这项耗资数百万美元的设计建造项目包括新的2,615英尺桥的设计和建造,对现有东行结构的维修和对现有西行结构的拆除。密苏里州交通运输部的一个重要目标是最大程度地减少施工对I-64走廊沿线交通的影响。在不减少整个过程中的车道数的情况下,建造新桥。在三个月的时间里,Burns&McDonnell完成了这座桥的最新设计,并按进度加快了进度,计划于2015年7月1日完成。

著录项

  • 来源
    《Engineering news-record》 |2014年第12期|26-26|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:12:13

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号