首页> 美国政府科技报告 >Accelerated Construction of Bridge 14802301, Greene County, Missouri, with Prefabricated Stay-in-Place Glass Fiber Reinforced Polymer Reinforcement; Final rept
【24h】

Accelerated Construction of Bridge 14802301, Greene County, Missouri, with Prefabricated Stay-in-Place Glass Fiber Reinforced Polymer Reinforcement; Final rept

机译:密苏里州格林县14802301桥加速施工,采用预制嵌入式玻璃纤维增​​强聚合物增强材料;最终的评论

获取原文

摘要

In the two-year project reported herein, a new prefabricated stay-in-place (SIP) glass fiber reinforced polymer (GFRP) reinforcing system for the accelerated construction of bridge decks was developed and implemented in the reconstruction of Bridge 1482301 in Greene County, Missouri, USA. The owner opted for the replacement of the 70-year old bridge due to the severe corrosion-induced deterioration of the superstructure. A significant joint effort was required for the concept development, design, analysis, detailing, full-scale laboratory validation, development of project special provisions, and construction planning and execution. Related tasks were completed in coordination between Missouri S&T and the University of Wisconsin-Madison, FRP reinforcement manufacturers, the Greene County Highway Department (owner), the engineer-of-record, and the designated contractor. The project demonstrated a technology that combines the superior durability of internal FRP reinforcement for concrete, and the substantial constructability advantages that derive from the use of light-weight advanced composite systems engineered in an innovative, integrated stay-in-place form.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号