首页> 外文期刊>Engineering news-record >Digging Damage to Buried Utility Lines Continues to Drop
【24h】

Digging Damage to Buried Utility Lines Continues to Drop

机译:对地下公用管线的挖掘损坏继续下降

获取原文
获取原文并翻译 | 示例
           

摘要

Incidents of damage to buried utility lines during excavation work dropped by about 5% last year compared to 2012, according to the 2013 Damage Implementation Reporting Tool Report, released this month by the Common Ground Alliance. There were 335,000 excavation-damage incidents last year compared to 675,000 in 2004, estimates CGA's tenth annual DIRT Report. In addition, while construction spending increased by 7.4% from 2012 to 2013, there were 15,000 fewer incidents. "Locate utilities requests" made via toll-free 811 calls, which are directed to local one-call centers representing all utilities, get some of the credit, says CGA.
机译:根据共同地面联盟本月发布的《 2013年损害实现报告工具报告》,与2012年相比,去年在挖掘工作期间对地下公用事业管线造成的损害事件下降了约5%。 CGA第十次年度DIRT报告估计,去年发生了33.5万起挖掘破坏事件,而2004年为675,000起。此外,尽管从2012年到2013年,建筑支出增加了7.4%,但事故数量却减少了15,000件。 CGA表示,通过免费811呼叫发出的“查找公用事业请求”,可以直接代表代表所有公用事业的本地一通电话中心。

著录项

  • 来源
    《Engineering news-record》 |2014年第11期|16-16|共1页
  • 作者

    Nadine M. Post;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号