首页> 外文期刊>Engineering news-record >More Inspections Set for Span That Sagged in Green Bay
【24h】

More Inspections Set for Span That Sagged in Green Bay

机译:为在绿湾陷下的跨度设置更多检查

获取原文
获取原文并翻译 | 示例
       

摘要

Inspection of the Green Bay, Wis.-sited Leo Frigo Bridge, which developed a 2.5-ft sag last year after a piling buckled, also showed severe corrosion in four other piers that "significantly reduced the structural capacity" of their foundation systems, a state report said. Five piers were classified as "Tier 1" in terms of damage severity and potential for safety problems. They were repaired before the bridge re-opened in January, though the studies and analysis continued. The Wisconsin Dept. of Transportation issued an executive summary in August, and the full report is due by year-end.
机译:对位于威斯康星州格林贝的Leo Frigo桥进行检查,该桥在打桩后发生扭曲,去年发展了一个2.5英尺的下陷,它还显示出另外四个墩的严重腐蚀,“显着降低了其基础系统的结构能力”,国家报告说。根据损坏的严重程度和潜在的安全隐患,五个墩被分类为“第1层”。尽管研究和分析仍在继续,但在1月桥梁重新开放之前,对它们进行了维修。威斯康星州交通运输部于8月发布了一份执行摘要,报告全文应在年底前提交。

著录项

  • 来源
    《Engineering news-record》 |2014年第8期|24-24|共1页
  • 作者

    Candy McCampbell;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:12:11

相似文献

  • 外文文献
  • 中文文献
  • 专利