首页> 外文期刊>Engineering news-record >Optimizing Material Management
【24h】

Optimizing Material Management

机译:优化物料管理

获取原文
获取原文并翻译 | 示例
       

摘要

The successful delivery of a large new or expansion project, whether power plant or steel mill, is directly tied to the timely delivery and installation of all the necessary components from pipes and pumps to motors and mechanical systems. For voestalpine Texas LLC, the logistics management challenge came to the forefront when they began work on a new direct reduction plant near Corpus Christi, Texas. The plant, for which the main components are supplied by Siemens Industry Inc. and its consortium partner Midrex Technologies, will be the largest hot briquetted iron (HBI) plant in the world. The challenge is to complete the project by late 2015.
机译:无论是发电厂还是钢铁厂,大型新项目或扩建项目的成功交付都与及时交付和安装从管道和泵到电动机和机械系统的所有必要组件直接相关。对于奥钢联得克萨斯州有限责任公司来说,当他们开始在得克萨斯州科珀斯克里斯蒂市附近的一家新的直接还原工厂工作时,物流管理的挑战就成为最重要的问题。该工厂的主要部件由西门子工业公司及其财团合作伙伴Midrex Technologies提供,将成为世界上最大的热压块铁(HBI)工厂。挑战是要在2015年底之前完成该项目。

著录项

  • 来源
    《Engineering news-record》 |2015年第8期|64-64|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:11:38

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号