首页> 外文期刊>Engineering news-record >Portable Dam Helped Utility Function During Construction
【24h】

Portable Dam Helped Utility Function During Construction

机译:便携式大坝在施工过程中有助于实用功能

获取原文
获取原文并翻译 | 示例
       

摘要

The Charlotte-Mecklenburg Utility Dept. (CMUD) in North Carolina required major modifications to an existing chlorine contact basin. Construction required installation of a new concrete contact tank in an active effluent flow lagoon. Designers from HDR created a temporary cofferdam system from Portadam that allowed work to take place in the active basin. Construction of the replacement tank could then occur while the diverted water continued to be processed through the existing lagoon. "Our system does not disturb the subsurface and can perform in flowing waters. This was key to the success of this project," says Tim McTigue, director of business development with Portadam. Once installed, the new contact tank was placed into service, the remaining flow lagoon was drained, sludge was removed and extensive grading was completed. The lagoon bottom and its sloped sides were lined with 10 in. of reinforced concrete, thus converting the remaining 8-acre lagoon into a new flow-equalization cell. The $7.2-million project was completed in 14 months.
机译:北卡罗莱纳州的夏洛特-梅克伦堡公用事业部(CMUD)需要对现有的氯接触池进行重大修改。施工需要在活动的污水池中安装一个新的混凝土接触池。 HDR的设计师从Portadam创建了一个临时围堰系统,该系统允许在活动盆地中进行工作。然后,在转移的水继续通过现有的泻湖进行处理的同时,可以进行替换水箱的建造。 Portadam业务开发总监Tim McTigue说:“我们的系统不会干扰地下环境,并且可以在流动的水中运行。这是该项目成功的关键。”安装后,将新的接触池投入使用,排空剩余的泻湖,清除污泥,并完成广泛的分级。泻湖的底部和倾斜的侧面衬有10英寸的钢筋混凝土,从而将剩余的8英亩泻湖转换为新的流量均衡单元。这项耗资720万美元的项目在14个月内完成。

著录项

  • 来源
    《Engineering news-record》 |2017年第9期|106-106|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:10:46

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号