首页> 外文期刊>Engineering news-record >Formed to Fit a Next-Generation Renewable Resource
【24h】

Formed to Fit a Next-Generation Renewable Resource

机译:为适应下一代可再生资源而成立

获取原文
获取原文并翻译 | 示例
       

摘要

The $7.2-billion, 695-MW Keeyask Generating Station hydroelectric generating station in Manitoba, Canada, at the Split Lake Resource Management Area will provide clean energy-an average of 4,400 GW hours of electricity each year-to both Canada and the United States when complete in 2021. BBE Hydro Constructors LP, a limited partnership of Bechtel Canada Co., Barnard Construction of Canada Ltd. and Ellis Don Civil Ltd., is charged with constructing the station, which will include a seven-unit powerhouse/service bay complex and a seven-bay spillway.
机译:位于斯普利特湖资源管理区,位于加拿大曼尼托巴,耗资72亿美元,695兆瓦的Keeyask发电站水力发电站将为加拿大和美国提供清洁能源-每年平均提供4,400 GW小时的电力。该电站将于2021年完工。BBEHydro Constructors LP是Bechtel Canada Co.,加拿大Barnard Construction Ltd.和Ellis Don Civil Ltd.的有限合伙企业,负责建设该电站,其中包括一个由7个单元组成的电站/服务湾综合体。和一个七湾溢洪道。

著录项

  • 来源
    《Engineering news-record》 |2017年第1期|C14-C14|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:10:36

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号