Haul and Lift of Refinery Combination Tower Goes Off Without a Hitch

机译:炼油厂组合塔的运输和升降机没有挂钩

获取原文
获取原文并翻译 | 示例
           

摘要

Transporting a massive 555,000-lb refinery combination tower over 72 miles of land and water is a challenge not too many lifting and hauling providers can handle. Calling on its extensive planning, engineering, logistics, heavy haul/heavy lift, rigging and barging experience, Deep South proved up to the challenge. Crews lifted the tower using Deep South's 700-ton capacity J&R Engineering gantry system, loaded it onto a Goldhofer Dual-Lane transporter, and hauled it about 43 miles to a barge site in Port Arthur, Texas. It was then transloaded onto SPMT transporters using gantries and rolled onto a barge. Once docked near the refinery, two 6-axle-line, double-wide SPMTs were used to roll the tower into position where it was lifted by a 2,500-ton VersaCrane TC-36000/S1 (with 450-ft of boom) and a 440-ton Terex-Demag CC-2400-1 crawler crane.
机译:运输巨大的555,000磅炼油厂组合塔,超过72英里的陆地和水是一个挑战,而不是太多的升降和拖运供应商可以处理。 呼吁其广泛的规划,工程,物流,重载/重型升力,索具和磨碎的体验,深南探讨了挑战。 船员使用深南700吨容量的J&R工程龙门系统抬起塔楼,将其装载到Goldhofer双车道运输车上,并将其拖到德克萨斯州港口港口的驳船网站约43英里。 然后使用喇叭齿轮将其转移到SPMT转运辊上并滚到驳船上。 一旦炼油厂附近,使用两条6轴线,双宽的SPMTS将塔滚到塔中的位置,其中将其抬起2,500吨Versacrane TC-36000 / S1(带450英尺的臂架)和a 440吨Terex-Demag CC-2400-1履带式起重机。

著录项

  • 来源
    《Engineering news-record》 |2021年第7期|28-28|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号