首页> 外文期刊>Engineering news-record >Texas Central Completes Its Team for High Speed Rail Job
【24h】

Texas Central Completes Its Team for High Speed Rail Job

机译:德克萨斯中心完成了高速铁路工作的团队

获取原文
获取原文并翻译 | 示例
       

摘要

Private developer Texas Central announced last month the newest member of its team that will build the high-speed train connecting Houston and North Texas. Mass. Electric Construction Co., a subsidiary of Kiewit Corp., will be installing the systems that supply and distribute electrical power for running the train and related equipment, the signaling and control of the trains, as well as communications, to ensure that the trains, tracks and operators can all communicate with one another and network operations.
机译:私人开发商Texas Central宣布上个月其团队最新成员,将建立连接休斯顿和北德克萨斯州的高速列车。群众。电气建筑有限公司,Kiepit Corp.的子公司将安装系统,供应和分配电力,用于运行火车和相关设备,列车的信令和控制,以及通信,以确保列车,曲目和运营商都可以互相通信和网络操作。

著录项

  • 来源
    《Engineering news-record》 |2019年第14期|17-17|共1页
  • 作者

    Louise Poirier;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 22:30:52

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号