首页> 外文期刊>Engineering news-record >A BETTER CONNECTION FOR AN ICON
【24h】

A BETTER CONNECTION FOR AN ICON

机译:更好的图标连接

获取原文
获取原文并翻译 | 示例
       

摘要

Located at the base of Eero Saarinen's iconic Arch, this LEED Gold, $108.9-million project renovated and expanded the half-century-old subterranean museum and visitor center and added a new west entrance. The largest public-private partnership investment ever in a national park, the project team sought to expand and improve the visitor's center and connect the park via a walking path to St. Louis' Old Courthouse, which had been cut off by a highway. It also had to be built without shutting down the Arch, which gets nearly 3 million visitors a year.
机译:位于塞勒Saarinen的标志性拱门的基地,这个Leed Gold,1.089亿美元的项目进行了翻新,并扩大了半世纪的地下博物馆和游客中心,并增加了一个新的西入口。该项目队在国家公园的最大公私伙伴关系投资,该项目队伍旨在扩大和改进访客中心,并通过步行路径与圣路易斯的旧法院连接,这是一条公路被切断的道路。它也必须建成,而不会关闭拱门,每年获得近300万游客。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号