首页> 外文期刊>Engineering news-record >Weathering the Mack Hatcher Parkway Project
【24h】

Weathering the Mack Hatcher Parkway Project

机译:风化桶孵化器帕克工程

获取原文
获取原文并翻译 | 示例
       

摘要

A 3.1-mile highway extension on the Mack Hatcher Parkway in Franklin, Tenn., is under construction. Unique to this project is a bridge approximately 2,900 ft long crossing the Harpeth River and its associated floodway. "To optimize the crossing over the river portions of the bridge, we're using weathering steel," says Tony Montiel, construction engineering and inspection (CEI) manager for Volkert. "Weathering steel contains a certain amount of surface corrosion for protection, eliminating the need for paint, and it's also more cost effective than concrete because we're dealing with longer spans due to the double river crossings. By using steel, we don't have to place piers in the water, which could be an environmental issue during construction."
机译:在富兰克林的Mack Hatcher Parkway的3.1英里高速公路延伸,在富兰克林,Tenn,正在建设中。这个项目独有的是一座大约2,900英尺长的桥梁河流河及其相关洪水道。 “优化桥梁的横穿桥梁,我们正在采用风化钢,”Volkert的Tony Montiel,建筑工程和检查(CEI)经理说。 “耐候钢含有一定量的保护,消除了涂料的需求,而且还比混凝土更具成本效益,因为我们由于双河流交叉而处理更长的跨度。通过使用钢,我们不会必须将码头放在水中,这在建造期间可能是一个环境问题。“

著录项

  • 来源
    《Engineering news-record》 |2019年第3期|46-46|共1页
  • 作者

    Eda Galeno;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 22:30:49

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号