A Bottom-Up Approach to On-Time, On-Budget Projects

机译:自下而上的方法,按时完成预算项目

获取原文
获取原文并翻译 | 示例
       

摘要

Cost overruns and delayed projects are increasingly unacceptable, as owners demand that estimates, budgets and schedules better align with construction reality. Effectively matching actuals to estimates, schedules and budgets is largely dependent on an appropriate level of detail-a challenge a decade ago. Today, modern systems have the intelligence to capture history and benchmark estimates, budgets and schedules to a granular level. For instance, concrete columns for a bridge deck require several steps, such as form setting, pouring concrete, stripping, etc. In a building or plant scenario, the granular breakdown might be at the component level-think pieces of structural steel, spools of pipe or conduit. Accurate estimates of time, work hours and cost to complete each "step" or component provide meaningful intelligence. There is much that can be learned and repeated on future projects at the component level with a bottom-up approach to project management.
机译:由于业主要求估算,预算和进度表更好地符合施工实际,因此成本超支和项目延误越来越难以接受。有效地将实际数据与估算,计划和预算相匹配在很大程度上取决于适当的详细程度-十年前是一个挑战。如今,现代系统具有智能化功能,可以将历史记录和基准估算,预算和计划表精确地捕获。例如,桥梁桥面的混凝土柱需要几个步骤,例如模板设置,浇筑混凝土,剥离等。在建筑物或工厂中,颗粒状的破裂可能发生在组件级别,例如结构钢块,线轴。管道或导管。完成每个“步骤”或组件的时间,工作时间和成本的准确估算可提供有意义的情报。使用自下而上的项目管理方法,可以在组件级别的未来项目中学习和重复很多东西。

著录项

  • 来源
    《Engineering news-record》 |2019年第1期|36-36|共1页
  • 作者

    Brad Barth;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 04:02:05

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号