首页> 外文期刊>Engineering news-record >Unstick the Process Now
【24h】

Unstick the Process Now

机译:立即取消处理

获取原文
获取原文并翻译 | 示例
       

摘要

In an age when image recognition, Big Data analysis and artificial intelligence are coming to define construction, outdated and inefficient contracting and construction management practices won't cut it to build critical infrastructure at the scale and speed they're now needed. Innovative methods such as public-private partnerships and integrated projectdelivery already are proving their value globally to fast-track construction and avoid costly errors from poor planning and management. Political leaders must adopt such approaches pronto if there's any hope to upgrade U.S. infrastructure before it deteriorates beyond any realistic cost and schedule framework. ASCE's D+ infrastructure grade in 2017 was the same as in 2013.
机译:在图像识别,大数据分析和人工智能正在定义建筑的时代,过时且效率低下的承包和建筑管理实践不会削减它来构建现在所需的规模和速度的关键基础架构。公私伙伴关系和综合项目交付等创新方法已经在全球证明了其价值,可快速建设,并避免因规划和管理不善而造成的代价高昂的错误。如果在美国基础设施恶化到任何实际成本和时间表框架之前没有任何升级的希望,政治领导人必须立即采取这种方法。 ASCE在2017年的D +基础设施等级与2013年相同。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号