A constrained urban site. An ambitious completion deadline. A booming construction market with limited craft labor availability. Ordinarily, these factors are a recipe for projects fraught with execution headaches and cost concerns, particularly during the construction phase, when anything can happen and often does.For the design and construction team behind the 12-story SOVA apartment building in Denver, however, these challenges presented an opportunity to lift prefabrication techniques to new levels, literally and figuratively.
展开▼
机译:受限制的城市用地。雄心勃勃的完成期限。蓬勃发展的建筑市场,有限的手工业工人。通常,这些因素是导致执行头痛和成本问题的项目的秘诀,尤其是在施工阶段,什么事情都可能发生并且经常发生。 r n对于丹佛这座12层SOVA公寓楼背后的设计和施工团队然而,这些挑战提供了将预制技术从字面上和形象上提升到新水平的机会。
展开▼