首页> 外文期刊>Engineering news-record >U.S. Court Orders Alabama Power Dam License Review
【24h】

U.S. Court Orders Alabama Power Dam License Review

机译:美国法院命令阿拉巴马州电力大坝许可证审查

获取原文
获取原文并翻译 | 示例
       

摘要

A federal court earlier this summer struck down the license of Alabama Power Co. to operate seven hydroelectric dams on the Coosa River in Alabama and Georgia that generate 960 MW, but what must be done to have it reinstated remains a mystery. The Birmingham utility is working closely with the Federal Energy Regulatory Commission on how to proceed and expects a decision before year end. Since the now-vacated license was issued in 2013, the firm has spent up to $3 5 million to add equipment that could help meet new requirements.
机译:今年夏天初,联邦法院取消了阿拉巴马州电力公司的经营许可,以经营阿拉巴马州和佐治亚州库萨河上的七座水力发电大坝,发电量达960兆瓦,但恢复原状仍然是一个谜。伯明翰的公用事业公司正在与联邦能源管理委员会紧密合作,探讨如何进行并期望在年底之前做出决定。自从现在空缺的许可证于2013年颁发以来,该公司已花费高达3,500万美元来添加有助于满足新要求的设备。

著录项

  • 来源
    《Engineering news-record》 |2018年第9期|10-10|共1页
  • 作者

    Mary B. Powers;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 04:01:54

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号