首页> 外文期刊>Engineering news-record >Michigan, Enbridge Agree On New Pipeline in a Tunnel
【24h】

Michigan, Enbridge Agree On New Pipeline in a Tunnel

机译:密歇根州,安布里奇市商定隧道中的新管道

获取原文
获取原文并翻译 | 示例
           

摘要

The state of Michigan has approved a deal with Enbridge to build a new oil pipeline through the Straits of Mackinac. Replacing a section that currently lies exposed to underwater elements, the proposed pipeline will be built in a tunnel 100 ft below the floor of the strait where Lake Michigan and Lake Huron connect. The complex project, estimated to cost between $300 million and $650 million, is predicted to take seven to 10 years to develop and construct, says Enbridge, a Canadian oil transportation specialist. State officials emphasized that Enbridge, not Michigan taxpayers, would pay for construction. Enbridge pledged not only to replace the existing 65-year-old Line 5 oil and liquid natural gas pipeline, but also to add a utility corridor and tunnel that could include power lines, fiberoptic telecommunications cables and similar infrastructure. Initial plans call for a tunnel large enough for vehicles to drive through, allowing for maintenance and inspection.
机译:密歇根州已批准与Enbridge达成一项协议,以建造一条穿越麦基诺海峡的新输油管道。拟议中的管道将取代密歇根湖和休伦湖相连的海峡地面以下100英尺的隧道,以取代目前暴露于水下元素的一段。加拿大石油运输专家恩布里奇说,这个复杂的项目估计耗资3亿至6.5亿美元,预计开发和建设将花费7至10年的时间。州政府官员强调说,恩布里奇而不是密歇根州的纳税人会为建筑付费。 Enbridge承诺不仅要替换已有65年历史的5号线石油和液体天然气管道,而且还要增加一条公用事业走廊和隧道,其中可能包括电力线,光纤通讯电缆和类似基础设施。最初的计划要求建立一个足够大的隧道以供车辆驶过,以便进行维护和检查。

著录项

  • 来源
    《Engineering news-record》 |2018年第10期|10-10|共1页
  • 作者

    Jeff Yoders;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号