...
首页> 外文期刊>IEEE Transactions on Engineering Management >Multiproject strategy, design transfer, and project performance: a survey of automobile development projects in the US and Japan
【24h】

Multiproject strategy, design transfer, and project performance: a survey of automobile development projects in the US and Japan

机译:多项目战略,设计转让和项目绩效:美国和日本的汽车开发项目调查

获取原文
获取原文并翻译 | 示例
           

摘要

Large manufacturers usually need to manage multiple projects in order to leverage their financial and engineering resource investments on new technologies and designs. The purpose of this paper is to explore the relationship between different multiproject strategies and project performance measured by lead time and engineering hours. The multiproject strategy in this study focuses on different ways of transferring core technologies and designs from one project to another within the firm. First, this paper proposes a typology of different multiproject strategies, which categorizes new product development projects into four types: new design, rapid design transfer, sequential design transfer, and design modification. Second, using survey results on 103 different new product projects at 10 automobile firms in Japan and the US, this study concludes that projects using the rapid design transfer strategy are the most efficient in terms of engineering hours. Only through rapid design transfer can a preceding design be transferred from a base project to a new project with effective task sharing among engineers and mutual adjustments between the two projects. This paper also discusses organizational requirements for managing rapid design transfer projects. Neither a pure project-team approach nor a functional approach seem appropriate for the management of concurrent multiple projects.
机译:大型制造商通常需要管理多个项目,以便将其财务和工程资源投资用于新技术和设计。本文的目的是探索不同的多项目策略和项目绩效之间的关系,这些策略通过交付时间和工程时间来衡量。本研究中的多项目策略着重于将核心技术和设计从公司中的一个项目转移到另一个项目的不同方式。首先,本文提出了不同的多项目策略的类型,将新产品开发项目分为四种类型:新设计,快速设计转移,顺序设计转移和设计修改。其次,使用对日本和美国10家汽车公司的103个不同新产品项目的调查结果,得出的结论是,就工程时间而言,采用快速设计转移策略的项目效率最高。只有通过快速的设计转移,才能将先前的设计从基础项目转移到新项目,工程师之间可以有效地共享任务,并且两个项目之间可以相互调整。本文还讨论了管理快速设计转移项目的组织要求。单纯的项目团​​队方法或功能性方法似乎都不适合同时进行多个项目的管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号