首页> 外文期刊>The engineering economist >A Breakeven Procedure For A Multi-period Project
【24h】

A Breakeven Procedure For A Multi-period Project

机译:多时期项目的盈亏平衡程序

获取原文
获取原文并翻译 | 示例
           

摘要

Breakeven analysis is often limited to the analysis of a project with a short term time horizon. This paper presents a solution technique for the analysis of a project with a multi-period planning horizon. The solution procedure considers variations in production rates and variations in prices and costs. The solution methodology is used to find out how much output is to be produced for a project's life or sub-period, and how much time is taken for a project to breakeven. The proposed solution technique also provides insight to the relationship between NPV and breakeven quantity. This illustrates the difference of the solution methodology from conventional breakeven analysis. A sensitivity analysis in the procedure is as valid as the one in conventional breakeven analysis.
机译:盈亏平衡分析通常仅限于对短期时间范围内的项目进行分析。本文提出了一种解决方案技术,用于分析具有多周期计划范围的项目。解决方案过程考虑了生产率的变化以及价格和成本的变化。解决方案方法用于找出在项目生命周期或子周期内将要生产多少产出,以及要使项目达到收支平衡需要花费多少时间。提出的解决方案技术还提供了对NPV和收支平衡数量之间关系的洞察力。这说明了解决方法与常规盈亏平衡分析的区别。该方法中的敏感性分析与常规盈亏平衡分析中的敏感性分析一样有效。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号