首页> 外文期刊>The engineering economist >CALCULATING DEVELOPER CHARGES FOR URBAN INFRASTRUCTURE: A FEASIBLE METHOD FOR APPLYING MARGINAL COST PRICING
【24h】

CALCULATING DEVELOPER CHARGES FOR URBAN INFRASTRUCTURE: A FEASIBLE METHOD FOR APPLYING MARGINAL COST PRICING

机译:计算城市基础设施开发费用:一种应用边际成本定价的可行方法

获取原文
获取原文并翻译 | 示例
       

摘要

This paper considers the application of marginal cost pricing to the calculation of developer charges, also termed exactions or impact fees, in the contemporary urban environment. We derive an "ideal" measure of long-run marginal capacity cost (MCC) of urban infrastructure expansion. Given practical difficulties in estimating MCC, we develop an alternative Adjusted Amortization Method (AAM) with less onerous data requirements. Using a simulation model we compare the magnitudes of developer charges derived from the ideal MCC measure, our AAM method and three other common approaches to the measurement of MCC. Our results show that an adjusted version of the AAM formula performs very well.
机译:本文考虑了边际成本定价在当代城市环境中计算开发商费用(也称为固定费用或影响费用)时的应用。我们得出了城市基础设施扩展的长期边际容量成本(MCC)的“理想”度量。鉴于估算MCC的实际困难,我们开发了另一种具有较少繁琐数据要求的调整摊销方法(AAM)。使用模拟模型,我们比较了从理想的MCC测量,我们的AAM方法和其他三种测量MCC的常用方法得出的显影剂电荷量。我们的结果表明,调整后的AAM公式的效果非常好。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号