首页> 外文期刊>The engineering economist >Parallel Asset Replacement Problem under Economies of Scale with Multiple Challengers
【24h】

Parallel Asset Replacement Problem under Economies of Scale with Multiple Challengers

机译:具有多个挑战者的规模经济下的并行资产置换问题

获取原文
获取原文并翻译 | 示例
       

摘要

The parallel replacement problem under economies of scale (PRES) determines minimum cost replacement schedules for each individual asset in a group of assets that operate in parallel. A fixed cost is incurred in any period in which an asset is purchased. These fixed costs induce economies of scale, making replacement schedules for these assets economically interdependent. We prove that PRES is NP-hard and present integer programming formulations for four variants of the problem in which multiple asset types, or challengers, are available for replacement (MPRES). We then derive valid inequalities for PRES and MPRES, which are similar in structure to flow cover inequalities developed in the context of fixed charge network problems. Experiments illustrate that the inequalities are effective in improving the integrality gap of MPRES instances.
机译:规模经济(PRES)下的并行替换问题决定了一组并行运行的资产中每个资产的最低成本替换时间表。购买资产的任何期间均产生固定成本。这些固定成本带来规模经济,使这些资产的更换时间表在经济上相互依赖。我们证明PRES是NP难的,并且针对其中四个资产类型或挑战者可用于替换(MPRES)的问题的四个变体,提出了整数编程公式。然后,我们得出PRES和MPRES的有效不等式,其结构类似于在固定收费网络问题的背景下发展的流量覆盖不等式。实验表明,不等式有效地改善了MPRES实例的完整性差距。

著录项

  • 来源
    《The engineering economist》 |2014年第4期|237-258|共22页
  • 作者单位

    Industrial and Manufacturing Engineering, Wichita State University, 1845 N. Fairmount, Wichita, KS 67260-0035;

    Department of Industrial and Systems Engineering, University of Florida, Gainesville, Florida;

    College of Engineering, University of Massachusetts Lowell, Lowell, Massachusetts;

    UBS AG, Stamford, Connecticut;

  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 23:29:50

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号