Green building projects: schedule performance, influential factors and solutions

机译:绿色建筑项目:进度绩效,影响因素和解决方案

获取原文
获取原文并翻译 | 示例
           

摘要

Purpose - The purposes of this paper are to: investigate schedule performance of new and retrofitting green building projects; identify the critical factors that influence the schedule performance of new and retrofitting green building projects; and provide solutions to improve schedule performance of new and retrofitting green building projects. Design/methodology/approach - A questionnaire survey were conducted and responses were received from 34 firms experienced in green building projects in Singapore. After the data from the survey had been analyzed, face-to-face interviews were conducted with two senior project managers to solicit comments on the survey results. Findings - This study identified the degree of project delay in 98 new green building projects and 51 retrofitting green building projects in Singapore. The result indicated that 22 percent of the Singaporean green building projects were plagued with delay and retrofitting projects had a significantly higher likelihood of delay and significantly longer extension than new projects. In addition, "consultant cooperation to solve problems" was the most influential to schedule performance of both new and retrofitting green building projects, and the two project groups agreed on the overall ranking of the factors affecting schedule performance. Research limitations/implications - There may be geographical limitation on the conclusions drawn from the findings. Also, the sample size was still small, despite a relatively high response rate. In addition, the majority of the respondents were contractors as other project players were reluctant to respond to the survey. Practical implications - This study provides a clear understanding of the schedule performance of green building projects as well as the critical factors that should be highlighted when constructing green building projects. Also, strategies to overcome the negative impact of these factors allow practitioners to better deal with the potential causes of delay and to attain the schedule performance. Originality/value - Although construction delays have been widely investigated in previous studies relating to construction management, few have attempted to analyze the schedule performance of new and retrofitting green buildings. Thus, this study adds significantly to the existing research on both green building and construction delay.
机译:目的-本文的目的是:研究新的和改造的绿色建筑项目的进度绩效;确定影响新的和改造的绿色建筑项目进度性能的关键因素;并提供解决方案以改善新的和改造的绿色建筑项目的进度性能。设计/方法/方法-进行了问卷调查,并收到了来自新加坡绿色建筑项目经验丰富的34家公司的答复。在分析了调查数据之后,与两名高级项目经理进行了面对面的访谈,以征求对调查结果的意见。调查结果-这项研究确定了新加坡98个新的绿色建筑项目和51个翻新的绿色建筑项目的项目延迟程度。结果表明,新加坡绿色建筑项目中有22%受到延迟的困扰,与新项目相比,改造项目的延迟可能性和延期时间明显更长。此外,“顾问合作解决问题”对新建和改建绿色建筑项目的进度影响最大,两个项目组就影响进度性能的因素的总体排名达成了一致。研究的局限性/意义-从发现中得出的结论可能存在地域限制。而且,尽管响应率相对较高,但样本量仍然很小。此外,由于其他项目参与者不愿对调查做出回应,大多数受访者是承包商。实际意义-这项研究清楚地了解了绿色建筑项目的进度表现以及在构建绿色建筑项目时应强调的关键因素。而且,克服这些因素的负面影响的策略使从业人员可以更好地处理造成延误的潜在原因,并实现进度表的绩效。原创性/价值-尽管在有关建筑管理的先前研究中已广泛调查了建筑延误,但很少有人尝试分析新建和翻新的绿色建筑的进度性能。因此,这项研究大大增加了有关绿色建筑和施工延误的现有研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号