The challenges of adopting new engineering contract: a Hong Kong study

机译:采用新工程合同的挑战:香港的一项研究

获取原文
获取原文并翻译 | 示例
       

摘要

Purpose Project delays and cost over-runs are few common major problems arising from conventional contracts. To overcome these issues, the Hong Kong Government has been practicing the use of the New Engineering Contract (NEC) forms in several public works projects. However, despite the successful outcomes and the positive signs of adopting NEC, it appears that NEC forms of contracts are not widely adopted in the Hong Kong construction industry even after 25 years of their first introduction. The purpose of this paper is to identify the challenges and barriers for not implementing NEC widely in Hong Kong. Design/methodology/approach Based on a questionnaire survey data collected from 45 senior industry professionals, and six semi-structured interviews, the study evaluated the perceptions of construction professionals as to why NEC is still not popular in the industry and reported the relative importance of challenges in the implementation of NEC in Hong Kong. Findings The results reveal that "People are not willing to change," "Limited number of trained professionals" and "Insufficient case law and adjudication experience" are the most significant challenges and barriers in adopting NEC. These findings are also supported by the opinions of construction professionals through semi-structured interviews. Originality/value The empirical evidence of the study provides an insight into the challenges faced by the construction industry of Hong Kong. NEC form of contract is the way forward in order to create a better working environment conducive for all the parties that would result in better construction project performance and productivity.
机译:目的项目延误和成本超支是由常规合同引起的几个常见的主要问题。为了解决这些问题,香港政府一直在一些公共工程项目中练习使用新工程合同(NEC)表格。但是,尽管取得了成功的结果和采用NEC的积极迹象,但NEC形式的合同似乎即使在首次引入25年后仍未在香港建筑业广泛采用。本文的目的是找出未在香港广泛实施NEC的挑战和障碍。设计/方法/方法基于从45位资深行业专业人士收集的问卷调查数据和六次半结构化访谈中,该研究评估了建筑专业人士对NEC为什么仍不流行于行业的看法,并报告了NEC的相对重要性。在香港实施NEC面临的挑战。结果结果表明,“人们不愿意改变”,“受过培训的专业人员数量有限”和“判例法和审判经验不足”是采用NEC的最大挑战和障碍。这些发现也得到了建筑专业人员通过半结构化访谈的观点的支持。原创性/价值这项研究的经验证据提供了对香港建筑业所面临挑战的洞见。 NEC合同形式是前进的道路,以便为所有人创造更好的工作环境,从而改善建筑项目的绩效和生产率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号